â–ş Listen Live
â–ş Listen Live

PG stormwater public engagement comes later this month

The City of Prince George will be asking the public for its opinion on a new stormwater management plan starting the week of September 20th.

A 330-page report to City Council said the city currently spends $1.35 per metre annually on the maintenance of its stormwater system which is less than half of the national median ($2.85/m) when compared to other Canadian cities that participate in the National Water and Wastewater Benchmarking Initiative.

The report also mentions that the average age of the city’s storm sewers and culverts is 40 years and most pipes are expected to last 30-80 years, depending on the materials used.

In a previous city council discussion, it was estimated that a tax levy for the stormwater management plan would raise taxes by about 4%.

Councillor Cori Ramsay listed off all the infrastructure in the city:

  • 385 km storm sewers
  • 690 km of ditches
  • over 962 culverts
  • 5,789 catch basins
  • 6 stormwater pump stations
  • 4,087 manholes
  • 21,227 lateral lines
  • 73 subsurface infiltration facilities
  • 26 engineered ponds
  • 293 outlets for receiving water

“That is a ton of infrastructure, and when you look at it all stacked up like that, it kind of makes sense why we’re spending $4 million on that,” said Ramsay.

The report also showed that Prince George has a relatively small population compared to the size of the stormwater system.

In the report, city staff recommend either a dedicated stormwater tax levy or an Equivalent Residential Unit based variable stormwater rate to pay for the project, but Director of Finance Kris Dalio said that decision was still a ways away.

“I wouldn’t say the next calendar year is a realistic period. The big focus right now is about education and engagement and the financial options will take time to develop, and see how we get there, how fast we can get there. All of that still needs to be worked out,” said Dalio.

After the city engages with residents about the stormwater system, another report will be brought to council in November.

Something going on in the Prince George area you think people should know about?
Send us a news tip by emailing [email protected].

Continue Reading

cjci Now playing play

cirx Now playing play

- Advertisement -

Related Articles

- Advertisement -

Latest News

Fifth generating unit comes online at Site C

The Site C Project has reached another major milestone with the dam's fifth generating unit coming online today. "Commissioning the fifth generating unit at Site C is a significant step towards securing more clean and affordable electricity for communities, homes and businesses," said Minister of Energy and Climate Solutions Adrian Dix.

Canada Post employees represented by CUPW to give vote on final offers

CUPW Employees with Canada Post will be able to vote on the latest contract offer.

New protection measures in place for Great Bear Sea  

B.C. is introducing new protection measures for 14.5 square...

Save our Streets pitches bail reform, prolific offender changes to BC Federal Liberal caucus

One of the co-founders of the Save our Streets Coalition (SOS) believes the federal government can do more to crack down on repeat offenders as well as provide a full continuum of care for those suffering from addiction and mental illness. The group sat down with the federal Liberals BC caucus on Monday in Kelowna to discuss these issues as well as bail reform.

B.C. streamlines process for U.S. and international doctors to work in the province

U.S.-trained doctors can now become fully licensed in British Columbia without the need for further assessment if they hold certain U.S. certifications.
- Advertisement -